OUR SCOOPE :

  • Preparing electromechanical shop drawing.
  • Preparing Infrastructre shop drawing.
  • The owner: Central Agency for Reconstruction
  • Main Consultant: ECG
  • Contractor: Hassan Allam construction

Duration :

From February 2023 – December 2023